The completion time having the highest probability best defines
A) preferred time.
B) pessimistic time.
C) most likely time.
D) optimistic time.
Correct Answer:
Verified
Q61: A method of planning and managing projects
Q62: Which of the following includes activities performed
Q63: Shortening an activity is called
A)float.
B)crash.
C)reduction.
D)smoothing.
Q64: The ratio of rise and run of
Q65: If the optimistic time is 3,the most
Q67: In CCPM,a finite amount of time that
Q68: An overall management philosophy introduced by Goldratt
Q69: What is PDM? Why is it useful?
Q70: The longest time that an activity might
Q71: Identify and describe three dependencies of project