Work to be performed can come from the work package level of the work breakdown structure as well as other sources.Which of these is NOT a source of authorized work to be performed?
A) Corrective actions
B) Preventive actions
C) Scope creep
D) Defect repairs
Correct Answer:
Verified
Q31: All of the following accurately apply to
Q32: With respect to performance reporting,which of these
Q33: Q34: This Agile project reporting tool is useful Q35: Some organizations rely upon a formal group Q37: The Budget at Completion (BAC)is the sum Q38: During schedule and cost control,when comparing performance Q39: Change control is a process wherein change Q40: All of the following accurately describe earned Q41: Describe the three different categories of risk