The standard practice with AOA and AON is to estimate activity times under the assumption of resource loadings that are __________.
A) probabilistic
B) crashed
C) normal
D) dynamic
Correct Answer:
Verified
Q13: The use of _ activity time estimates
Q14: If the crash cost is $2,500,the normal
Q15: If deterministic time estimates are used,and if
Q16: In CPM,_ are specified.
A)exact levels of uncertainty
Q17: The points between the extreme points of
Q19: Fast-tracking is a partial use of the
Q20: _ itself is always a critical resource
Q21: The _ heuristic provides a general solution
Q22: The usual purpose of the _ scheduling
Q23: Using Goldratt's meaning of the word "dependent,"