TB Figure 17.3 is taken from the text figure showing the systems selection task and documents.
Required:
Explode bubble 3.0 Systems Selection into a Level 1 DFD. The DFD should include the items listed below. The data flows for available hardware and physical requirements are listed twice because these data flows will each appear twice in the Level 1 DFD.
Process bubbles
3.1 Prepare requests for proposal
3.2 Evaluate vendor proposals
3.3 Assess software plan
3.4 Complete configuration plan
External entities
External sources
Hardware/ software vendors
Data flows
Approved configuration plan
Available hardware
Available hardware
Logical specification
Physical requirements
Physical requirements
Request for proposal
Software specifications
Suggested hardware resources
Vendor proposals
Correct Answer:
Verified
Q196: _ maintenance adjusts applications to reflect changing
Q197: The _ should describe operating procedures for
Q198: With the _ approach to systems implementation,
Q199: The _ approach forces the users to
Q200: When implementing _ systems, it is often
Q201: Discuss the accountant's involvement in systems
Q202: Discuss four ways that an accountant is
Q203: Briefly discuss application service providers (ASP) and
Q204: Growing State University (GSU) is planning to
Q205: Figure TB 17.5 is the DFD of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents