The following information relates to Ramesy Manufacturing:
To produce a unit of product
There is a wait time of 5 minutes before the Cutting Department begins a batch, 15 minutes between the Cutting and Welding departments, a move and pre-wait between Welding and Polishing of 12 minutes, and a move and pre-wait between the Polishing and Finishing departments of 8 minutes.
-Refer to the figure.What is the production rate?
A) 7.5 units per hour
B) 12 units per hour
C) 15 units per hour
D) 20 units per hour
Correct Answer:
Verified
Q24: What is the only allocation used regularly
Q25: The following information relates to Markely
Q26: Why does lean accounting work in a
Q27: If a facility has costs of $100,000
Q28: What is the JIT solution?
A)It requires carrying
Q30: What is the usual formula for calculating
Q31: Which of the following is considered a
Q32: Which of the following is considered a
Q33: Why is units shipped instead of units
Q34: How is overproduction of good controlled in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents