Question 21
Multiple Choice
What is characteristic of the emphasis on departmental efficiency?
Question 22
Multiple Choice
What are many overhead costs assigned to in a lean environment?
Question 23
Multiple Choice
What is the purpose of the production rate?
Question 24
Multiple Choice
What is the only allocation used regularly in a value stream cost assignment?
Question 25
Multiple Choice
The following information relates to Markely Manufacturing:
Ā MixingĀ DepartmentĀ
2
Ā minutesĀ perĀ unitĀ
Ā MouldingĀ DepartmentĀ
4
Ā minutesĀ perĀ unitĀ
Ā CastingĀ DepartmentĀ
6
Ā minutesĀ perĀ unitĀ
Ā FinishingĀ DepartmentĀ
3
Ā minutesĀ perĀ unitĀ
\begin{array} { l l } \text { Mixing Department } & 2 \text { minutes per unit } \\\text { Moulding Department } & 4 \text { minutes per unit } \\\text { Casting Department } & 6 \text { minutes per unit } \\\text { Finishing Department } & 3 \text { minutes per unit }\end{array}
Ā MixingĀ DepartmentĀ
Ā MouldingĀ DepartmentĀ
Ā CastingĀ DepartmentĀ
Ā FinishingĀ DepartmentĀ
ā
2
Ā minutesĀ perĀ unitĀ
4
Ā minutesĀ perĀ unitĀ
6
Ā minutesĀ perĀ unitĀ
3
Ā minutesĀ perĀ unitĀ
ā
There is a wait time of 8 minutes before the Mixing Department begins a batch, 5 minutes between the Mixing and Moulding departments, a move and pre-wait between Moulding and Casting of 10 minutes, and a move and pre-wait between the Casting and Finishing departments of 12 minutes. -Refer to the figure.How long would it take to process the first unit of a 20-unit batch under a cellular manufacturing setup?
Question 26
Multiple Choice
Why does lean accounting work in a lean manufacturing environment?
Question 27
Multiple Choice
If a facility has costs of $100,000 per year and 20,000 square metres,and if 19,000 square metres are absorbed by the value streams,what happens to the unabsorbed cost of the remaining 1,000 metres?