What is the most time-consuming activity in the physical design stage of the systems development life cycle (SDLC) ,or perhaps even in the entire SDLC process?
A) controls design
B) input design
C) output design
D) program design
Correct Answer:
Verified
Q4: Developing a general framework for implementing user
Q4: Which of the following is not a
Q6: All of the following reports have pre-specified
Q8: Who is responsible for evaluating the design
Q9: The decision about how often to produce
Q23: Which of the following statements below is
Q36: Physical input design considerations include
A)which transactions to
Q37: At what point in the systems development
Q39: Program design
A)spans all five stages of the
Q40: Which of the following statements is true?
A)Structured
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents