As part of its quality-improvement program a company is conducting a time study for a particular job. The time study encompassed 10 job cycles, and the results include the following cumulative times and performance rating factors for each element. The standard time for this job using an allowance factor of 16% is
A) 1.809 minutes.
B) 2.098 minutes.
C) 1.530 minutes.
D) 2.233 minutes.
Correct Answer:
Verified
Q6: The allowance factor is a percentage increase
Q11: A time study is a statistical sample
Q12: Under normal circumstances and conditions,the time required
Q14: _ time is the time required by
Q15: Rating worker performance is typically an objective,easy
Q20: The basic principle underlying an incentive piece-rate
Q20: As part of a time study a
Q21: How many observations should be taken to
Q23: As part of a time study a
Q25: Management believes a critical piece of equipment
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents