Which of the following is NOT a way of handling uncertainty when operating an MRP system?
A) Safety stock
B) Safety lead-time
C) Safety capacity
D) Back-up suppliers
Correct Answer:
Verified
Q14: An inflated master production schedule:
A)Is needed to
Q14: Cycle counting:
A)Is counting a fraction of inventory
Q15: Bills of materials are kept current with
Q16: The bill of materials:
A)Shows how much inventory
Q17: Planned lead times:
A)Usually are longer than actual
Q17: Which type of MRP system is used
Q20: The gross requirements of a given component
Q41: The master schedule should be frozen inside
Q42: MRP is a type of pull system.
Q44: The master schedule is prepared for product
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents