The gross requirements of a given component part in a MRP system are determined from:
A) Net requirements + on-hand
B) Net requirements of end item
C) Gross requirements of the immediate part
D) Planned order releases of the end item
E) Planned order releases of the immediate parent item
Correct Answer:
Verified
Q15: Bills of materials are kept current with
Q16: The bill of materials:
A)Shows how much inventory
Q17: Which type of MRP system is used
Q17: Planned lead times:
A)Usually are longer than actual
Q18: Which of the following is NOT a
Q25: Compare and contrast MRP systems and Order
Q29: MRP systems work better in a line
Q41: The master schedule should be frozen inside
Q42: MRP is a type of pull system.
Q44: The master schedule is prepared for product
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents