Which of the following is not an element of lean?
A) Small-lot production
B) Modularized master schedule
C) Multifunction workers
D) Kanban pull system
E) Perfect or nearly perfect quality
Correct Answer:
Verified
Q2: If a manufacturer has daily requirements for
Q3: How many cycles are required each day
Q3: The ideal setup time for a lean
Q6: According to the lean philosophy,it is required
Q7: The time it takes a container to
Q7: For production control,lean pull systems are best
Q8: Reduction of setup time is accomplished by
Q9: The principal objective of a lean system
Q28: Value stream maps are similar to flowcharts
Q37: External setups refer to actions that require
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents