The principal objective of a lean system is:
A) Worker participation
B) Reduction of inventory
C) Reduction of setup times
D) Improve the ROI of the firm
Correct Answer:
Verified
Q2: External setup time refers to:
A)The time it
Q4: Which of the following is not an
Q6: According to the lean philosophy,it is required
Q7: For production control,lean pull systems are best
Q7: The time it takes a container to
Q8: Reduction of setup time is accomplished by
Q13: Given the following information pertaining to item
Q14: Why is production leveled in a lean
Q28: Value stream maps are similar to flowcharts
Q37: External setups refer to actions that require