You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.
a.Draw the precedence diagram.
b.Determine the desired cycle time.
c.Determine the theoretical minimum number of stations needed.
d.Balance this line using most following tasks.
e.What is the efficiency of the line obtained in part d?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q129: What are the advantages and disadvantages of
Q136: Explain what the purpose of assembly line
Q138: "Having a focused work centre is like
Q142: There are three work centers (A,B,and C)behind
Q145: A work cell is required to make
Q146: Brandon's computer shop has hired a consultant
Q146: An electronics manufacturer makes remote control devices
Q152: A manufacturing work cell has a takt
Q208: What is a servicescape? How is it
Q261: Identify the four requirements for cellular production.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents