A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes.What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q141: You have been asked to balance a
Q142: There are three work centers (A,B,and C)behind
Q146: Brandon's computer shop has hired a consultant
Q146: An electronics manufacturer makes remote control devices
Q148: A firm is planning to set up
Q149: A facility is trying to set up
Q150: An airport is trying to balance where
Q152: A manufacturing work cell has a takt
Q156: A work cell is scheduled to build
Q208: What is a servicescape? How is it
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents