Table 7.11
The Pennsylvania Appliance Company is installing an assembly line to produce vacuum cleaners,and you,as an operations manager,are responsible for balancing the line.The work elements to be performed are listed,along with their times and immediate predecessors.
-Use the information in Table 7.11.The company is planning to operate 2 shifts per day,8 hours per shift.If the desired output rate of the line is 480 units per day,what is the cycle time?
A) 60 seconds
B) 120 seconds
C) 180 seconds
D) 240 seconds
Correct Answer:
Verified
Q49: In a drum-buffer-rope system, the lot size
Q101: Figure 7.1 Q102: Table 7.12 Q103: Table 7.10 Q104: Table 7.13 Q106: Table 7.12 Q107: Table 7.11 Q108: Table 7.14 Q109: Table 7.9 Q110: Figure 7.1
A company desires to set up
Balance the following line for an
The following information is given about
A company desires to set up
The Pennsylvania Appliance Company is installing
The production of a particular product
Balance the following line for an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents