Question 121
Multiple Choice
Table 10.8 Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days) :
-Use the information in Table 10.8 to answer this question.What car is repaired the latest (the most past due) if an SPT sequence is obeyed?
Question 122
Multiple Choice
Table 10.7 The framing department has six jobs waiting to be processed.It is now time zero and all jobs are ready to begin.Each has only one operation remaining.All jobs arrived at the same time,and FCFS begins with job A,then B,etc.
-Using the information in Table 10.7 and the earliest due date (EDD) rule,what is the average days past due?
Question 123
Essay
A(n)________ graphically displays the load on a productive resource of interest,i.e. ,when it is busy and when it is idle.
Question 124
Multiple Choice
Table 10.10 A work center has the following six jobs waiting to be processed (all times are shown in days) :
-Use the information in Table 10.10.Which job will be the first one completed if scheduling is done using the earliest due date (EDD) rule?
Question 125
Essay
________ is the amount of time by which a job missed its due date.
Question 126
Essay
________ is the amount of time a job spends in the service or manufacturing system.
Question 127
Essay
How do Gantt charts assist schedulers in arriving at feasible schedules?
Question 128
Multiple Choice
Table 10.10 A work center has the following six jobs waiting to be processed (all times are shown in days) :
-Use the information in Table 10.10.Which job will be the first one completed if scheduling is done using the first-come,first-served (FCFS) rule?
Question 129
Multiple Choice
Table 10.6 Bluebird University provides tutoring services for undergraduate students seven days a week.The daily requirements for tutors are:
Each tutor works five days a week and must have two consecutive days off,according to the contract. -Use the information in Table 10.6.How many days will have slack capacity?
Question 130
Multiple Choice
Table 10.8 Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days) :
-Use the information in Table 10.8 to answer this question.What car is repaired the latest (the most past due) if an EDD sequence is obeyed?
Question 131
Multiple Choice
Table 10.10 A work center has the following six jobs waiting to be processed (all times are shown in days) :
-Use the information in Table 10.10.What is the average past due (in days) using the EDD rule?
Question 132
Multiple Choice
Table 10.10 A work center has the following six jobs waiting to be processed (all times are shown in days) :
-Use the information in Table 10.10.What is the average past due (in days) using the FCFS rule?
Question 133
Multiple Choice
Table 10.7 The framing department has six jobs waiting to be processed.It is now time zero and all jobs are ready to begin.Each has only one operation remaining.All jobs arrived at the same time,and FCFS begins with job A,then B,etc.
-Using the information in Table 10.7 and the first-come,first-served (FCFS) rule,what is the average days past due?
Question 134
Essay
A hospital must have a skeleton crew on hand during the undesirable work period from midnight to 8 o'clock.One way to make sure that all employees have the opportunity to work this shift is by adopting a(n)________.