Which of the following is a common heuristic for assembly line balancing?
A) debits near the windows, credits near the door
B) manufacturers locate near materials, retailers locate near customers
C) earliest due date first
D) ranked positional weight
E) average takt time
Correct Answer:
Verified
Q61: Balancing low-cost storage with low-cost material handling
Q81: The central problem in product-oriented layout planning
Q87: A disadvantage of product-oriented layout is that
A)
Q87: Which of these layouts is most suitable
Q88: The main advantage of a product-oriented layout
Q99: Which of the following is not a
Q103: In assembly-line balancing,the theoretical minimum number of
Q120: Four hundred and eighty minutes of production
Q292: In assembly-line balancing, cycle time (the ratio
Q300: A production line is to be designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents