Question
Pick up the excavation where measurements are made in square metres for payment.

A)ordinary cuttings up to 1 m
B)surface dressing up to 15 cm depths
C)surface excavation up to 30 cm depths
D)both (b) and (c)
Use Space or
up arrow
down arrow
to flip the card.
Question
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

A)1.80 litres for 5 to 10 users
B)1.20 litres for 15 users
C)1.35 for 20 users
D)all the above
Question
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

A)breadth of the wall
B)half breadth of wall on each side
C)one fourth breadth of wall on each side
D)none of these
Question
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

A)1.5 m3
B)2.5 m3
C)3.5 m3
D)5.0 m3
Question
The value of 'C' of Indian type W.C. shown in the given figure is: <strong>The value of 'C' of Indian type W.C. shown in the given figure is:  </strong> A)400 mm B)450 mm C)500 mm D)550 mm <div style=padding-top: 35px>

A)400 mm
B)450 mm
C)500 mm
D)550 mm
Question
The area is measured correct to the nearest

A)0.01 sqm
B)0.02 sqm
C)0.03 sqm
D)0.04 sqm
Question
The measurement is not made in square metres in case of

A)d.p.c. (damp proof course)
B)form works
C)concrete jeffries
D)r.c. chhajja
Question
The value of 'A' of Indian type W.C. shown in the given figure is: <strong>The value of 'A' of Indian type W.C. shown in the given figure is:  </strong> A)25 cm B)30 cm C)40 cm D)45 cm <div style=padding-top: 35px>

A)25 cm
B)30 cm
C)40 cm
D)45 cm
Question
The trap which is provided to disconnect the house drain from the street sewer is called

A)master trap
B)intercepting trap
C)interception manhole
D)all the above
Question
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

A)2.0 %
B)2.5 %
C)4.0 %
D)5.0 %
Question
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is <strong>The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is  </strong> A)rs. 400 B)rs. 425 C)rs. 450 D)rs. 500 <div style=padding-top: 35px>

A)rs. 400
B)rs. 425
C)rs. 450
D)rs. 500
Question
The expected out turn of 2.5 cm cement concrete floor per mansion per day

A)2.5 sqm
B)5.0 sqm
C)7.5 sqm
D)10 sqm
Question
Pick up the correct statement from the following:

A)the bent up bars at a support resist the negative bending moment
B)the bent up bars at a support resist the sharing force
C)the bending of bars near supports is generally at 45°
D)all the above
Question
While preparing a detailed estimate

A)dimension should be measured correct to 0.01 m
B)area should be measured correct to 0.01 sqm
C)volume should be measured correct to 0.01 cum
D)all the above
Question
The item of the brick structure measured in sq.m, is

A)reinforced brick work
B)broken glass coping
C)brick edging
D)brick work in arches
Question
The most reliable estimate is

A)detailed estimate
B)preliminary estimate
C)plinth area estimate
D)cube rate estimate
Question
According to ISI method of measurement, the order of the sequence is

A)length, breadth, height
B)breadth, length, height
C)height, length, breadth
D)none of these
Question
Anti-siphonage pipe is connected to

A)main soil pipe
B)bottom of p trap w.c.
C)top of p trap w.c.
D)side of water closet
Question
Pick up the correct statement from the following:

A)in a gully trap, a water seal of 6 to 7.5 cm is provided
B)the gully trap collects waste water from the kitchen, sink, wash basins, etc.
C)the gully trap disconnects the sullage drain from the main drainage system
D)the grating provided over gully traps is 23 cm square
Question
Pick up the correct statement from the following:

A)bricks are paid per thousand
B)cement is paid per 50 kg bag
C)lime is paid per quintal
D)all the above
Question
Pick up the correct statement from the following:

A)all pipes and fittings are classified according to their diameters
B)the diameter of the pipes is the nominal diameter of internal bore
C)all pipes are measured along the centre line of the pipes in metres
D)all the above
Question
Pick up the correct statement in case of water supply.

A)pipes laid in trenches and pipes fixed to walls are measured separately
B)cutting through walls and floors are included with the item
C)pipes are classified according to their sizes and quality
D)all the above
Question
The concrete work for the following part of the building of specified thickness is measured in square metres

A)root slabs
B)floors
C)wall panels
D)all the above
Question
The expected out turn of 12 mm plastering with cement mortar is

A)2.5 sq m
B)4.0 sq m
C)6.0 sq m
D)8.0 sq m
Question
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

A)l + 0.42 d
B)l + (2 × 0.42 d)
C)l - (0.42 d)
D)l - (2 × 0.4 d)
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Mecasurement and Estimation in Construction Work
1
Pick up the excavation where measurements are made in square metres for payment.

A)ordinary cuttings up to 1 m
B)surface dressing up to 15 cm depths
C)surface excavation up to 30 cm depths
D)both (b) and (c)
both (b) and (c)
2
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

A)1.80 litres for 5 to 10 users
B)1.20 litres for 15 users
C)1.35 for 20 users
D)all the above
all the above
3
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

A)breadth of the wall
B)half breadth of wall on each side
C)one fourth breadth of wall on each side
D)none of these
half breadth of wall on each side
4
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

A)1.5 m3
B)2.5 m3
C)3.5 m3
D)5.0 m3
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
The value of 'C' of Indian type W.C. shown in the given figure is: <strong>The value of 'C' of Indian type W.C. shown in the given figure is:  </strong> A)400 mm B)450 mm C)500 mm D)550 mm

A)400 mm
B)450 mm
C)500 mm
D)550 mm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
The area is measured correct to the nearest

A)0.01 sqm
B)0.02 sqm
C)0.03 sqm
D)0.04 sqm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
The measurement is not made in square metres in case of

A)d.p.c. (damp proof course)
B)form works
C)concrete jeffries
D)r.c. chhajja
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
The value of 'A' of Indian type W.C. shown in the given figure is: <strong>The value of 'A' of Indian type W.C. shown in the given figure is:  </strong> A)25 cm B)30 cm C)40 cm D)45 cm

A)25 cm
B)30 cm
C)40 cm
D)45 cm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
The trap which is provided to disconnect the house drain from the street sewer is called

A)master trap
B)intercepting trap
C)interception manhole
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

A)2.0 %
B)2.5 %
C)4.0 %
D)5.0 %
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is <strong>The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is  </strong> A)rs. 400 B)rs. 425 C)rs. 450 D)rs. 500

A)rs. 400
B)rs. 425
C)rs. 450
D)rs. 500
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
The expected out turn of 2.5 cm cement concrete floor per mansion per day

A)2.5 sqm
B)5.0 sqm
C)7.5 sqm
D)10 sqm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
Pick up the correct statement from the following:

A)the bent up bars at a support resist the negative bending moment
B)the bent up bars at a support resist the sharing force
C)the bending of bars near supports is generally at 45°
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
While preparing a detailed estimate

A)dimension should be measured correct to 0.01 m
B)area should be measured correct to 0.01 sqm
C)volume should be measured correct to 0.01 cum
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
The item of the brick structure measured in sq.m, is

A)reinforced brick work
B)broken glass coping
C)brick edging
D)brick work in arches
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
The most reliable estimate is

A)detailed estimate
B)preliminary estimate
C)plinth area estimate
D)cube rate estimate
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
According to ISI method of measurement, the order of the sequence is

A)length, breadth, height
B)breadth, length, height
C)height, length, breadth
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
Anti-siphonage pipe is connected to

A)main soil pipe
B)bottom of p trap w.c.
C)top of p trap w.c.
D)side of water closet
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
Pick up the correct statement from the following:

A)in a gully trap, a water seal of 6 to 7.5 cm is provided
B)the gully trap collects waste water from the kitchen, sink, wash basins, etc.
C)the gully trap disconnects the sullage drain from the main drainage system
D)the grating provided over gully traps is 23 cm square
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
Pick up the correct statement from the following:

A)bricks are paid per thousand
B)cement is paid per 50 kg bag
C)lime is paid per quintal
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
Pick up the correct statement from the following:

A)all pipes and fittings are classified according to their diameters
B)the diameter of the pipes is the nominal diameter of internal bore
C)all pipes are measured along the centre line of the pipes in metres
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
Pick up the correct statement in case of water supply.

A)pipes laid in trenches and pipes fixed to walls are measured separately
B)cutting through walls and floors are included with the item
C)pipes are classified according to their sizes and quality
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
The concrete work for the following part of the building of specified thickness is measured in square metres

A)root slabs
B)floors
C)wall panels
D)all the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
The expected out turn of 12 mm plastering with cement mortar is

A)2.5 sq m
B)4.0 sq m
C)6.0 sq m
D)8.0 sq m
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

A)l + 0.42 d
B)l + (2 × 0.42 d)
C)l - (0.42 d)
D)l - (2 × 0.4 d)
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 25 flashcards in this deck.