Deck 3: Owners, Designers, and Constructors

Full screen (f)
exit full mode
Question
Design Professionals are always bound by the same Contract the Owner requires the Constructor to perform
Use Space or
up arrow
down arrow
to flip the card.
Question
Bid shopping is a good way to make money
Question
When dealing with a case, you can expect

A) the judge to be fairer than the jury
B) the jury to be fairer than the judge
C) that neither the judge or jury will be fair
D) that you will probably be better off if you can find a solution outside of a courtroom
Question
In Design - Bid - Build

A) the Owner is contractually in the middle between the Designers and the Constructor
B) the Designer is caught in the middle between the Owner and the Constructor
C) the Constructor is contractually in the middle between the Owner and Designer
D) the problem is nobody wins
Question
There are two main types of construction

A) tall and flat
B) x and y
C) up and down
D) vertical and horizontal
Question
Although not written in the contract

A) everyone will answer to civil authorities if necessary
B) everyone has the duty to cooperate
C) no one can blame another until the actual incident is completed
D) no one can bring a case against another until the contract is completed
Question
For millennia

A) construction was almost all masonry
B) contracts did not exist
C) the Architect was also the Builder
D) people built their own structures for themselves
Question
Projects are usually done

A) with a single builder
B) with a Constructor and several Subcontractors
C) by the Builder that has been chosen by the Architect as most qualified
D) a Design Builder
Question
Multi-prime Contracts

A) use more detailed contracts
B) require less supervision
C) separate key trades on the project
D) are seldom used on government work
Question
In horizontal construction, we would expect the Design Professional team to usually be led by an Engineer
Question
Good Contracts spell out the duty for each party to cooperate
Question
The Design Professionals are always bound by the same Contract the Owner requires to Constructor to perform
Question
If at all possible, avoid remedies imposed by courts
Question
The Owner expects the project to be completed within budget, meeting standards of quality, and it all done safely
Question
There are three broad types of construction: horizontal, vertical and diagonal
Question
Engineers are basically needed for horizontal construction but not so much for vertical
Question
For centuries, the primary concern for design engineering was structural
Question
Now the electrical and mechanical concerns of buildings must also be engineered carefully
Question
With few exceptions, Architects have never been Builders
Question
A risk shifting clause

A) can be passed down to others
B) can affect the General Contractor
C) can affect how Constructors approach a project
D) all of these
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Owners, Designers, and Constructors
1
Design Professionals are always bound by the same Contract the Owner requires the Constructor to perform
False
2
Bid shopping is a good way to make money
False
3
When dealing with a case, you can expect

A) the judge to be fairer than the jury
B) the jury to be fairer than the judge
C) that neither the judge or jury will be fair
D) that you will probably be better off if you can find a solution outside of a courtroom
D
4
In Design - Bid - Build

A) the Owner is contractually in the middle between the Designers and the Constructor
B) the Designer is caught in the middle between the Owner and the Constructor
C) the Constructor is contractually in the middle between the Owner and Designer
D) the problem is nobody wins
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
There are two main types of construction

A) tall and flat
B) x and y
C) up and down
D) vertical and horizontal
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Although not written in the contract

A) everyone will answer to civil authorities if necessary
B) everyone has the duty to cooperate
C) no one can blame another until the actual incident is completed
D) no one can bring a case against another until the contract is completed
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
For millennia

A) construction was almost all masonry
B) contracts did not exist
C) the Architect was also the Builder
D) people built their own structures for themselves
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Projects are usually done

A) with a single builder
B) with a Constructor and several Subcontractors
C) by the Builder that has been chosen by the Architect as most qualified
D) a Design Builder
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Multi-prime Contracts

A) use more detailed contracts
B) require less supervision
C) separate key trades on the project
D) are seldom used on government work
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
In horizontal construction, we would expect the Design Professional team to usually be led by an Engineer
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
Good Contracts spell out the duty for each party to cooperate
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
The Design Professionals are always bound by the same Contract the Owner requires to Constructor to perform
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
If at all possible, avoid remedies imposed by courts
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The Owner expects the project to be completed within budget, meeting standards of quality, and it all done safely
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
There are three broad types of construction: horizontal, vertical and diagonal
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Engineers are basically needed for horizontal construction but not so much for vertical
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
For centuries, the primary concern for design engineering was structural
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
Now the electrical and mechanical concerns of buildings must also be engineered carefully
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
With few exceptions, Architects have never been Builders
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
A risk shifting clause

A) can be passed down to others
B) can affect the General Contractor
C) can affect how Constructors approach a project
D) all of these
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.