When a process is judged out of control for an important character?istic,what corrective action should be taken?
A) The process should be stopped and corrective action must be taken.
B) The process should be investigated for Type I error.
C) The process should be investigated for Type II error.
D) The process should continue,however,100% inspection is required.
E) The process should continue until another sample is taken.
Correct Answer:
Verified
Q74: The term "2 sigma limits" in the
Q75: When using control charts sample size is
Q76: The DMAIC methodology involves all EXCEPT which
Q77: The probability of concluding that an assignable
Q78: For which of the following would a
Q80: A shift in the process mean for
Q81: A Quality Analyst wants to construct a
Q82: For a process to be capable,it must
Q83: What should managers have in place if
Q84: A Quality Analyst wants to construct a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents