Solved

A Quality Analyst Wants to Construct a Sample Mean Chart

Question 84

Multiple Choice

A Quality Analyst wants to construct a sample mean chart for controlling a packaging process.He knows from past experience that whenever this process is under control,package weight is normally distributed with a mean of twenty ounces and a standard deviation of two ounces.Each day last week,he randomly selected four packages and weighed each with the following results: A Quality Analyst wants to construct a sample mean chart for controlling a packaging process.He knows from past experience that whenever this process is under control,package weight is normally distributed with a mean of twenty ounces and a standard deviation of two ounces.Each day last week,he randomly selected four packages and weighed each with the following results:   If he uses upper and lower control limits of 23 and 17 ounces,what is his risk of concluding this process is in control when it is actually out of control (Type II error) ? A) 0.0026 B) 0.0456 C) 0.3174 D) 0.6826 E) 0.9544 If he uses upper and lower control limits of 23 and 17 ounces,what is his risk of concluding this process is in control when it is actually out of control (Type II error) ?


A) 0.0026
B) 0.0456
C) 0.3174
D) 0.6826
E) 0.9544

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents