If safety stock is desired,it should be built into which portion of MRP?
A) any
B) none
C) raw materials
D) finished goods
E) either C or D
Correct Answer:
Verified
Q41: Gross material requirements do not take into
Q42: When safety stock is deemed absolutely necessary,the
Q46: Consider the following product structure.
Q47: An order for 50 units of Product
Q49: A material requirements plan contains information with
Q51: Explain the difference between a gross requirements
Q53: In MRP, the number of units projected
Q55: Which of the following statements regarding the
Q72: An order for 110 units of Product
Q74: Distortion in MRP systems can be minimized
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents