Table 12-1
The following represents a project with know activity times. All times are in weeks.
-Using the data in Table 12-1, what is the minimum possible time required for completing the project?
A) 8
B) 14
C) 25
D) 10
E) None of the above
Correct Answer:
Verified
Q42: Given an activity's optimistic,most likely,and pessimistic time
Q46: Table 12-2
The following represents a project with
Q46: Given an activity's optimistic,most likely,and pessimistic time
Q47: Given the following small project, the critical
Q48: Table 12-1
The following represents a project with
Q49: Managers use the network analysis of PERT
Q51: Given an activity's optimistic,most likely,and pessimistic time
Q53: Table 12-2
The following represents a project with
Q57: Given an activity's optimistic,most likely,and pessimistic time
Q60: CPM
A)assumes we do not know ahead of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents