The following represents a project with four activities. All times are in weeks.
-According to Table 12-2, there are four activities in the project. Assume the normal distribution is appropriate to use to determine the probability of finishing by a particular time. What is the probability that the project is finished in 16 weeks or fewer? (Round to two decimals.)
A) 0.07
B) 0.93
C) 0.43
D) 0.77
E) None of the above
Correct Answer:
Verified
Q42: Given an activity's optimistic,most likely,and pessimistic time
Q43: The expected time in PERT is
A)a weighted
Q46: Given an activity's optimistic,most likely,and pessimistic time
Q49: Managers use the network analysis of PERT
Q53: Table 12-2
The following represents a project with
Q60: Given the following small project, the critical
Q61: Consider a project that has an expected
Q64: The critical path of a network is
Q73: Given an activity's optimistic,most likely,and pessimistic time
Q75: Which of the following questions can be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents