The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below. What is the overall risk factor for the project?
A) less than or equal to 0.6
B) greater than 0.6 but less than or equal to 0.7
C) greater than 0.7 but less than or equal to 0.8
D) greater than 0.8
Correct Answer:
Verified
Q30: Risk and opportunity:
A)both increase throughout the project
Q43: The probability that funds allocated to the
Q45: The probability that project revenues will not
Q45: Use the failure probability and consequence scores
Q46: The construction foreman posted a large sign
Q48: The residents of Enumclaw,Washington,live in the shadow
Q50: The mouse executive board meeting was drawing
Q68: With a cost factor of 0.1,a schedule
Q75: With a maturity risk of 0.3,a complexity
Q79: The consequences of failure categories of cost,schedule,reliability,and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents