The programming device must be connected to the controller:
A) at all times.
B) when entering a program.
C) when monitoring a program.
D) both b and c.
Correct Answer:
Verified
Q2: The power required to operate the logic
Q8: The central processing unit
A)looks at the inputs,
Q20: The scan time is the time required
A)to
Q21: The symbol Q22: The output interface module connects to: Q23: When a field device contact connected to Q27: PLC proprietary architecture: Q28: Block No.2 of the PLC block diagram Q30: The symbol Q31: The programming device:
A)sensing devices
A)is the opposite to open
A)is used to enter the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents