The variable overhead rate variance is the difference between the actual variable overhead rate and the standard variable overhead rate multiplied by the actual value of the cost driver.This is the formula for the variable overhead rate variance.
Correct Answer:
Verified
Q3: A standard cost system initially records manufacturing
Q4: A standard cost card shows what the
Q5: A price standard is the price that
Q6: The production manager is typically responsible for
Q7: The flexible budget can be used as
Q9: The price variance for direct labor is
Q10: When preparing a flexible budget,fixed costs should
Q11: A budget depends upon the level of
Q12: Fixed overhead does not have separate price
Q13: The production manager is typically responsible for