Fixed overhead does not have separate price and quantity variances.The model used to analyze variable costs does not apply to fixed overhead,so the fixed overhead spending variance cannot be broken down into price and quantity variances.
Correct Answer:
Verified
Q7: The flexible budget can be used as
Q8: The variable overhead rate variance is the
Q9: The price variance for direct labor is
Q10: When preparing a flexible budget,fixed costs should
Q11: A budget depends upon the level of
Q13: The production manager is typically responsible for
Q14: A standard cost system records cost at
Q15: The direct material quantity variance is the
Q16: The fixed overhead volume variance is the
Q17: A quantity standard is the amount of