Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
Supply Chain Focused Manufacturing
Quiz 7: JIT/Lean production
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Question 1
Essay
According to the conceptual framework of JIT, there are 8 practices considered essential for a comprehensive JIT implementation.At the same time, there are two additional practices which constitute the foundation of all 8 activities.List these two additional practices.
Question 2
Multiple Choice
Which of the following is a correct paper kaizen guidelines?
Question 3
Multiple Choice
When done properly, the implementation of Just in time (JIT) philosophy increases the company's performance.Choose the effects that do not contribute to this phenomenon. 1) Increases supplier dependency 2) Reduces the need for information sharing 3) Increases WIP Inventory levels 4) Reduces process variability
Question 4
Short Answer
In one sentence, describe the basic underlining concept of Just in time (JIT)manufacturing.
Question 5
Multiple Choice
The following are some of the requirements of Supplier Development.Which are not correct? 1) Focus on inspections after receipt 2) Implement judoka program 3) Reduce supplier lead times 4) Require frequent deliveries
Question 6
Multiple Choice
Choose an option that does not correctly fill in the blanks. -While there are many different definitions of lean manufacturing, lean can also be described as a set of manufacturing practices bundles including _____________ and _________________.
Question 7
Multiple Choice
Evidence has shown that the implementation of Just in time (JIT) philosophy is most successful in a ________________ environment.Fill in the blanks with the correct answers.
Question 8
Multiple Choice
JIT purchasing can reduce some of the many activities that is required with traditional purchasing.Which of the following activities are less likely to be affected by JIT purchasing? 1) Negotiation 2) Expediting 3) Receiving Inspection 4) Open-Order Status Paperwork
Question 9
Multiple Choice
Which of the following concepts are not associated with lean? 1) Pull 2) Kanban 3) Muda (Waste) 4) Kaizen
Question 10
Multiple Choice
A successful JIT organization requires the organization wide incorporation of elements such as ___________________.Find the choices that do not fit into the blank space of the previous statement. 1) A focus on increasing utilization 2) A hierarchical control organization with limited communication between layers 3) An emphasis on productivity 4) A passion for operational efficiency
Question 11
Multiple Choice
The implementation of JIT moves beyond an adoption of a tool set.It is a organization wide philosophical change.One method of managing change is the Kotter's 8 Steps.Which of the following is not included in Kotter's 8 Steps as a step?