An assembly line with 11 tasks is to be balanced. The longest task is 3 minutes, the shortest task is 0.8 minutes, and the sum of the task times is 25 minutes. The line will operate for 750 minutes per day.
a. Determine the minimum and maximum cycle times.
b. What range of output is theoretically possible for the line?
c. What is the minimum number of stations needed if the maximum output rate is to be sought?
d. What cycle time will provide an output rate of 300 units per day?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q151: A work cell is required to make
Q158: A company is trying to balance production
Q161: A work cell is scheduled to build
Q161: An assembly line is assigned as follows.
Q162: A manufacturing work cell has a takt
Q163: A work cell is scheduled to build
Q165: A manufacturing work cell has a takt
Q166: An assembly line with 11 tasks is
Q167: An assembly line has been designed
Q168: An assembly line has been designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents