A work cell is scheduled to build 250 digital light processor (DLP) assemblies each week. These assemblies are later installed into home theatre projection systems. The work cell has 16 hours of productive work each day, seven days per week. What is takt time for this cell?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q151: A work cell is required to make
Q158: A company is trying to balance production
Q158: A work cell is required to make
Q161: A work cell is scheduled to build
Q162: A manufacturing work cell has a takt
Q164: An assembly line with 11 tasks is
Q165: A manufacturing work cell has a takt
Q166: An assembly line with 11 tasks is
Q167: An assembly line has been designed
Q168: An assembly line has been designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents