When using a time-study approach,the standard time is
A) the normal time per cycle multiplied by 1.0 plus the allowance.
B) the select time multiplied by the rating factor, summed over all work elements.
C) the select time plus z times the standard deviation.
D) the normal time plus z times the standard deviation.
Correct Answer:
Verified
Q15: Timing the work elements using the snap-back
Q29: Garman observes a worker assembling peanut
Q30: Garman observes a worker assembling peanut
Q31: A manager is interested in setting a
Q33: Keith assembles peanut valves and the
Q36: A time-study analyst is attempting to determine
Q37: Which one of the following statements about
Q38: An analyst using a time study approach:
A)
Q38: Keith assembles peanut valves and the
Q38: Which one of the following statements about
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents