Question 121
Short Answer
The ability of one piece of software to interact with others is called ________ .
Question 122
Multiple Choice
Table 13.8 Sunshine Manufacture produces three products, X, Y, and Z. The production of these end items is controlled by an MRP system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled with two components of C and one component of A, each component of C is manufactured from one unit of B. End item Z is assembled from one unit of D and one unit of C, D is manufactured from one unit of A, and C is manufactured from one unit of B. -Use the information in Table 13.8.If level-by-level processing is used,what is a correct order for processing components A,B,C,and D?
Question 123
Short Answer
A(n)________ item is the final product sold to a customer.
Question 124
Short Answer
The ________ is a part of the material requirements plans that details how many end items will be produced within specified periods of time.
Question 125
Short Answer
An ________ is a company-wide process that cuts across functional areas,business units,geographic regions,and product lines.
Question 126
Short Answer
________ is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
Question 127
Short Answer
________ systems are large,integrated information systems that support many enterprise processes and data storage needs.
Question 128
Short Answer
The ________ is a record of all components of an item,the parent-component relationships,and usage quantities derived from engineering and process design.
Question 129
Short Answer
The ________ is a record that divides the future into time periods called time buckets.
Question 130
Short Answer
________ are the total demand derived from all parent production plans.
Question 131
Short Answer
In an MRP system,a(n)________ item has at least one parent and at least one component.
Question 132
Short Answer
In MRP,a(n)________ is an item that may go through one or more operations to be transformed into or become part of one or more parents.
Question 133
Short Answer
In MRP,a(n)________ is any item manufactured from one or more components.
Question 134
Short Answer
A(n)________ process that takes sales and operations plans; processes information in the way of time standards,routings,and other information on how the firm produces its services or products; and then plans the input requirements.
Question 135
Short Answer
MRP ________ is a process that converts the requirements of various final products into a material requirements plan that specifies the replenishment schedule of all the subassemblies,components,and raw materials needed by the final products.