In MasterFormat, Division 04 refers to
A) General Requirements.
B) Metals.
C) Existing Conditions.
D) Masonry.
E) none of the above.
Correct Answer:
Verified
Q4: The construction document set consists of
A)construction drawings,
Q5: In MasterFormat, Division 02 refers to
A)Procurement and
Q6: The construction drawings of a building project
Q7: The term MEP is an acronym for
A)mechanical,
Q8: In a typical building project, the coordination
Q10: The bidding documents include
A)construction drawings, specifications, addenda,
Q11: Who is responsible for ensuring the safety
Q12: The delivery of a typical building project,
Q13: MasterFormat consists of
A)20 divisions.
B)30 divisions.
C)40 divisions.
D)50 divisions.
E)none
Q14: In MasterFormat, flooring is part of
A)Division 07.
B)Division
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents