In which of the following project delivery methods does the GC provide preconstruction services?
A) DBB Method: Competitive Sealed Proposal
B) DBB Method: Invitational Bidding
C) DBB Method: Competitive Sealed Bidding
D) All of the above
E) None of the above
Correct Answer:
Verified
Q20: In MasterFormat, windows are part of
A)Division 06.
B)Division
Q21: The shop drawings are prepared by the
A)structural
Q22: When does the owner receive manufacturers' warranties
Q23: A record document set includes
A)as- built construction
Q24: The certificate of substantial completion is issued
Q26: The final completion inspection of the project
Q27: The project manual includes the project's construction
Q28: The owner is required to provide payment
Q29: A contract document set consists of
A)construction drawings,
Q30: The primary purpose of the contract modification
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents