Which of the following is the upper control limit for a c-chart (UCLc) with the average number of nonconformances per unit equal to 7?
A) More than 11 but less than or equal to 12
B) More than 12 but less than or equal to 13
C) More than 13 but less than or equal to 14
D) More than 14 but less than or equal to 15