In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what is the number of kanban card sets needed?
A) 5
B) 20
C) 27
D) 30
E) 34
Correct Answer:
Verified
Q51: Which of the following are related to
Q55: You have been called in as a
Q56: Applying lean concepts in manufacturing balances increases
Q59: In setting up a kanban control system
Q64: An activity where the parts that go
Q65: To develop a lean manufacturing system a
Q67: Which of the following statements holds true
Q68: In implementing a lean production system you
Q75: Group technology (GT) is credited with which
Q83: Which of the following is not listed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents