The overall project risk factor is known to be 0.6. The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure. The consequence of performance failure is twice the consequence of reliability failure, four times the consequence of schedule failure and eight times the consequence of cost failure. What is the probability of maturity failure?
A) 0.213
B) 0.197
C) 0.104
D) 0.148
Correct Answer:
Verified
Q42: What are any four common categories of
Q44: The probability that the investments made to
Q46: Technical risk is the probability that the
Q46: The project team toiled long into the
Q47: The consequences of failure categories of cost,schedule,reliability,and
Q49: Sketch a 2 × 2 risk management
Q53: The pointy-haired dean gently suggested that study
Q55: Use the failure probability and consequence scores
Q68: Project penalty clauses that initiate at mutually
Q69: Fred Knievel took out a substantial life
Unlock this Answer For Free Now!