Use the failure probability and consequence scores shown in the table to determine the consequence of failure for the project.
A) Greater than 0.7
B) Less than or equal to 0.7 but greater than 0.5
C) Less than or equal to 0.5 but greater than 0.3
D) Less than 0.2
Correct Answer:
Verified
Q42: What are any four common categories of
Q44: The overall consequence of failure was 0.4
Q46: Your project team is interested in determining
Q47: The consequences of failure categories of cost,schedule,reliability,and
Q49: Sketch a 2 × 2 risk management
Q51: The overall project risk factor is known
Q53: The pointy-haired dean gently suggested that study
Q57: The overall project risk factor is known
Q64: The Farm Fresh Egg project was too
Q68: Project penalty clauses that initiate at mutually