Table
A manufacturer using a kanban system has had problems with high inventory levels of one of the component parts it makes. Daily demand for the part is 3000 units, average waiting time during production is day, processing time is day per container, and a container holds 150 pieces.
-Use the information in Table 8.2. How many kanban containers would be required if a 10 % efficiency factor is used?
A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
Correct Answer:
Verified
Q26: The just- in- time (JIT) system is
Q27: All of the following wastes but one
Q28: The final assembly schedule in a JIT
Q29: Implementing a JIT system
A) requires an examination
Q30: Table
Q32: Table
Q33: In a JIT II system the
A) sales
Q34: In JIT systems, if a defective product
Q35: Suppliers often cite which of the following
Q36: According to JIT, an approach to reduce
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents