A person carries a 25.0-N rock through the path shown in the figure, starting at point A and ending at point B. The total time from A to B is 1.50 min. How much work did gravity do on the rock between A and B?
A) 625 J
B) 20.0 J
C) 275 J
D) 75 J
E) 0 J
Correct Answer:
Verified
Q9: Two uniform solid balls,one of radius R
Q14: Suppose a solid uniform sphere of mass
Q30: What is the minimum energy needed to
Q46: How large a net force is required
Q77: It requires 0.30 kJ of work
Q78: You carry a 7.0-kg bag of
Q80: A child does 350 J of
Q84: How much kinetic energy does a
Q88: A 2.0-kg object is lifted vertically through
Q98: How fast must a 6.0-kg cat run
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents