A report that shows the future capacity requirements based on released and planned orders for each time period of the plan is called:
A) load report
B) capacity report
C) order report
D) dispatch list
Correct Answer:
Verified
Q3: Available capacity in production planning is:
A) the
Q4: is responsible for capacity planning at the
Q5: The available capacity will be influenced by:
Q6: is responsible for determining the capacity required
Q7: The capacity available with no regard for
Q9: Over the previous three weeks a work
Q10: One hundred units of part A are
Q11: The percentage of time the work center
Q12: A work center was available for work
Q13: Information on the standard times for an