Solved

Match the Items Below

Question 204

Matching

Match the items below.

Premises:
The difference between actual overhead incurred and overhead budgeted for the standard hours allowed.
The hours that should have been worked for the units produced.
The difference between the actual quantity times the actual price and the actual quantity times the standard price.
The difference between total actual costs and total standard costs.
The difference between actual hours times the standard rate and standard hours times the standard rate.
Predetermined unit costs that are measures of performance.
The difference between normal capacity hours and standard hours allowed times the fixed overhead rate.
Standards based on an efficient level of performance that are attainable under expected operating conditions.
Standards based on the optimum level of performance under perfect operating conditions.
A double-entry system of accounting in which standard costs are used in making entries and variances are recognized in the accounts.
Responses:
Variances
Standard costs
Standard cost accounting system
Normal standards
Ideal standards
Materials price variance
Labor quantity variance
Overhead controllable variance
Overhead volume variance
Standard hours allowed

Correct Answer:

The difference between actual overhead incurred and overhead budgeted for the standard hours allowed.
The hours that should have been worked for the units produced.
The difference between the actual quantity times the actual price and the actual quantity times the standard price.
The difference between total actual costs and total standard costs.
The difference between actual hours times the standard rate and standard hours times the standard rate.
Predetermined unit costs that are measures of performance.
The difference between normal capacity hours and standard hours allowed times the fixed overhead rate.
Standards based on an efficient level of performance that are attainable under expected operating conditions.
Standards based on the optimum level of performance under perfect operating conditions.
A double-entry system of accounting in which standard costs are used in making entries and variances are recognized in the accounts.
Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents