Solved

An Activated Sludge Plant Cost $75 Million When It Was

Question 13

Short Answer

An activated sludge plant cost $75 million when it was built in 1995. The detailed cost breakdown is given below. Determine a weighted index for the construction of a similar plant in 2009.  Cost Element  Percent  Index (1995) Index (2009)  asibility study and design services 565105 bor 30170226 aterials 40180227 uipments including installation costs 25105137\begin{array} { l | c | c | c } \hline \text { Cost Element } & \text { Percent } & \text { Index } ( 1995 ) & \text { Index (2009) } \\\hline \text { asibility study and design services } & 5 & 65 & 105 \\\hline \text { bor } & 30 & 170 & 226 \\\hline \text { aterials } & 40 & 180 & 227 \\\hline \text { uipments including installation costs } & 25 & 105 & 137 \\\hline\end{array}

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents