Once the _____________ is scheduled according to its available capacity and the market demand it must satisfy, the____________ resources can be scheduled.
A) non- bottleneck, bottleneck
B) buffer, non- bottleneck
C) bottleneck, buffer
D) bottleneck, non- bottleneck
Correct Answer:
Verified
Q1: Dispatching is the function of _available jobs
Q2: _is defined as finding methods to maximize
Q3: In_ the next operation is allowed to
Q4: What does the MRP authorize the PAC
Q6: Parent X required 1 each of components
Q7: The _of a system refers to the
Q8: Utilization of a _resource is not determined
Q9: Discuss the three types of manufacturing processes.
Q10: An order for 100 of a product
Q11: A component made on a particular work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents