An order for 100 of a product is processed on work center A and B. The setup time on A is 50 minutes, and run time is 5 minutes per piece. The setup time on B is 60 minutes and the run time is 5 minutes per piece. Wait time between the two operations is 5 hours. The move time between A and B is 40 minutes. Wait time after operation B is 5 hours, and the move time into stores is 3 hours. Queue at work center A is 25 hours and a B is 35 hours Calculate the total manufacturing lead time for the order.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q5: Once the _ is scheduled according to
Q6: Parent X required 1 each of components
Q7: The _of a system refers to the
Q8: Utilization of a _resource is not determined
Q9: Discuss the three types of manufacturing processes.
Q11: A component made on a particular work
Q12: Today's date is day 175. Orders
Q13: Jobs are sequenced according to their processing
Q14: The "Theory of Constraints" was developed by:
A)
Q15: Discuss the types of information needed for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents