A person carries a 25.0-N rock through the path shown in the figure, starting at point A and ending at point B . The total time from A to B is 1.50 min. How much work did gravity do on the rock between A and B ?
A) 75 J
B) 0 J
C) 275 J
D) 625 J
E) 20.0 J