Multiple Choice

-Consider the digraphs shown above ; which of the digraphs have an outdegree of 3 at vertex G?
A) Only figure 1
B) Only figure 2
C) Both figure 1 and figure 2
D) Both figure 1 and figure 3
E) None of the above.
Correct Answer:
Verified