Kick Scooters
Metal frames for kick scooters are manufactured in two steps: Stamping and assembly. Each frame is made up of three pieces: one unit of part A and two units of part B.
The parts are fabricated by a single stamping machine that requires a set up time of 90 minutes switching between two part types. Once the machine is set up, the activity time for parts, regardless of type, is 30 seconds each piece. Currently, the stamping machine rotates its production between one batch of 120 part A's and 240 part B's. Completed parts move only when the entire batch is produced.
At assembly, parts are assembled manually to form the finished products. The three parts and a number of small purchased components are required for each unit of final product. Each product requires 30 minutes of labor time to assemble. There are 12 workers in assembly. There is sufficient demand to sell every scooter the system can make
-One way to increase process capacity is to
A) increase the batch size at the Stamping step
B) decrease the batch size at the Stamping step
C) add more workers at Assembly
D) none of the above
Correct Answer:
Verified
Q19: Toyota and Capital One Cases
-Which of the
Q20: Airport Massage Station
A small company just opened
Q21: Kick Scooters
Metal frames for kick scooters are
Q22: Q23: Old City Photographics Q24: Kick Scooters Q25: Old City Photographics Q26: Kick Scooters Q27: Old City Photographics Q28:
Located alongside a
Metal frames for kick scooters are
Located alongside a
Metal frames for kick scooters are
Located alongside a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents