Garman observes a worker assembling peanut valves and records the data displayed in the table. What is the select time for this job element?
A) 15 seconds
B) 20 seconds
C) 25 seconds
D) 30 seconds
Correct Answer:
Verified
Q16: A time study is the method most
Q17: The select time is the average observed
Q18: The standard time for a work element
Q19: The key to creating a work standard
Q20: A(n) _ is the time required for
Q22: During a time study, the following times
Q23: A time study analyst is determining the
Q24: The gentleman farmer recorded the time it
Q25: When using a time study approach, the
Q26: The gentleman farmer recorded the time it